Tech 7B 3rd Quarter 2006

  • Thanks for the great pictures Cydni.

    We had some great designs that really flew apart during crushing. Heads up!

    Class Champion for the Bridge Project

    Tech 7B  3/17/06

    Claire Brodie, Cydni Sanville, Geraldd Williams

    I believe the "KISS" concept worked this time.

    Bridge Cost $391  / pounds held 166 = efficiency of 2.355

    2nd place was very close with a E factor of 2.362

    Nice job class. Now on to the Lego Vehicle Challenge!